Installation direct on slab |
|
|
|
The
mats are fixed rolled on the concrete slab by a small wood board. The
distribution pipes are welded and fixed in their final position. The
complete room mats are tested according KaRo procedure Tim K55. The mats
stay under pressure during all the installation time and after. An
adhesive coat can be thrower to concretes slabs or not according to
plaster manufacturer’s instructions. |
|
|
|
|
|
|
|
|
The
plastering of the first coat is thrower to the slab and the KaRo mats
are unrolled under pressure. |
|
|
|
|
|
|
|
The
omega bands keep the capillaries pipes parallels. All the capillaries
pipes are integrated during the 5 and 10mn after the first plastering.
It's the responsibility of KaRo engineer to make sure that the mats are
perfectly installed with tensile up to the end and under pressure. He
will make sure that the capillaries pipes are well ambled in the first
coat of plaster. |
|
|
|
|
|
|
A
partner ship as to be established between the pargeter and the KaRo
engineer, who is unrolling the mats and the plasterer who is integrating
the mats to the plaster. |
|
|
|
|
|
|
Expansion joints as to be foreseen as usual. The
mats as to be recovered by a
second one centimetre thick coat of plaster with in one hour after the
matd as been integrated in the first plaster coat. Smoothing
of the plaster as to be done according the art rules. |
| More information is avalaible for installation of plaster ceiling (pdf format, in French) |
|