Perfoplaque

(plasterboard) Installation


Plates are either nailed of fixed on Still-Prim® supports


The mat is screwed on the plaster board

Some place is left for future partition walls


The distribution piping is set up approx. 2 cm (0.8 in) above the perforated board


The mat can be held during its mounting


Details of the piping


Distribution piping


Dilation joints have to be considered, as well as dissociating the wall from the ceiling


Plaster projection

Traditional plaster painting


More detailed information is available for installation of perfoplaque ceilings (pdf format, in French)


back to installation