Plaster Board Installation, with Click& Cool |
|
|
|
|
The mat is fixed on a plaster board, on site |
The board and mat are glued together |
|
|
|
|
30 mm (1.2 in) of insulation with vapor protection are set under the board |
The piping is finished and tested under 10 bar (145 psi). |
|
|
|
|
|
The active panel is fixed like a standard one and connected by the Click & Cool system |
Ceiling before painting |
| More detailed information is available for installation of Plasterboard ceilings (pdf format, in French) |
|






